top of page
Sorenson Engineering Mechanical Mezzanine.png

Sorenson Engineering Mechanical Mezzanine 

This project was a 10,000 sf structural steel mezzanine that we designed, fabricated and erected on a fast paced schedule, inside an existing building. This project was given to us 32 days before the client needed it to be complete, and we were able to design, fabricate, and erect the mezzanine, (2) steel staircases, and cover it with metal decking in 32 days.

IMG_1610.jpeg
IMG_1607.jpeg
IMG_2112.jpeg
IMG_2020.jpeg
IMG_8535.jpeg
IMG_8665.jpeg
IMG_5326.jpeg
IMG_2021.jpeg
IMG_0489.jpeg
IMG_2022.jpeg
bottom of page