top of page
Sorenson Engineering Mechanical Mezzanine
This project was a 10,000 sf structural steel mezzanine that we designed, fabricated and erected on a fast paced schedule, inside an existing building. This project was given to us 32 days before the client needed it to be complete, and we were able to design, fabricate, and erect the mezzanine, (2) steel staircases, and cover it with metal decking in 32 days.
bottom of page